美麗家園

Our Mission: ESTABLISHING AN INDUSTRY-BASED TRAINING PROGRAM forr children who want be an eagle.

Our Vision: PROVIDE A GUILDLINE TO ESTABLISH YOUR PROFESSIONAL DREAM COMES TRUE.

                                                                    For information you need, please email to:     GreenSkyDatabase@gmail.com


免责声明:本文内容源自网络,版权归原作者所有,如有侵犯您的原创版权请告知,我们将尽快删除相关内容。

 

 

Disclaimer: These codes may not be the most recent version. California may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

A consultant shall earn client's respection above meeting table, also keep a good relatonship after meeting.

--------------------------------------------------------

1.  Who is qualified to be a designer

  Q: May architects prepare, stamp, and sign mechanical, electrical, and plumbing drawings? 
      A: Yes. The Architects Practice Act allows architects to prepare, stamp, and sign mechanical, electrical, and plumbing drawings since the definition for scope of architectural practice includes 
“ … the design, in whole or in part, of buildings … .” (Ref.: BPC §§ 5500.1, 6737)

       Q: Board for Professional Engineers and Land Surveyors  2535 Capitol Oaks Drive, Suite 300  Sacramento, CA 95833  1-866-780-5370 www.bpelsg.ca.gov                                                                                                                                                                                       BPELSG.Enforcement.Information@dca.ca.gov
         A: STRUCTURAL ENGINEERS may design any building of any type. 

              CIVIL ENGINEERS may design any building of any type EXCEPT public schools and hospitals.
              ARCHITECTS may design any building of any type EXCEPT the structural portion of a hospital.
              UNLICENSED INDIVIDUALS may design only the following types of buildings: 
                      Single-family dwellings of not more than two stories and basement in height.
                      Multiple dwellings containing not more than four dwelling units of woodframe construction of not more than two stories and basement in height and no more than fourdwelling units per lot. 
                      Garages or other structures appurtenant to the dwellings described above of woodframe construction not more than two stories and basement in height. 
                       NOTE: If any portion of the structures described above does not meet the conventional woodframe requirements described in Title 24 of the California Code of Regulations or in the building codes of the local jurisdiction, then the building official having jurisdiction shall require the plans, calculations, and specifications for that portion of the structure to be prepared and signed and sealed by a licensed engineer or a licensed architect.
                      Agricultural and ranch buildings of wood frame construction, unless the building official having jurisdiction determines that an undue risk to the public health, safety,  welfare is involved.Store fronts,rior alterations or additions, fixtures, cabinetwork, furniture, or other appliances or equipment, including any work necessary to install these items,  or any alterations or additions to any building necessary to install these items, as long as the alterations do not affect the structural safety of the building.

 

-------------------------------------------------------

2. Who is qualified to sing off a project

       - Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the
               system design, construction or installation of features, materials, components, or manufactured devices for the scope of work

      https://casetext.com/statute/california-codes/business-and-professions-code-bpc/division-3-professions-and-vocations-generally-5000-999811

    

Business and Professions Code - BPC

Q&A: 

Q: Does an architect’s license entitle an architect to build an exempt building without a contractor’s license?
A: No. The construction of buildings is governed by the California Contractors License Law (commencing with BPC section 
7000). The law has an exemption that allows a person who is not a licensed contractor to construct a single-family residential 
structure provided they meet certain requirements. Questions concerning this exemption should be directed to the Contractors 
State License Board.(Ref.: BPC §§ 5500.1 and 7000 et seq.)

-----------------------------------------------------------------------------------------

Q: Who is qualified as a professional engineer.

                 https://casetext.com/statute/california-codes/business-and-professions-code-bpc/division-3-professions-and-vocations-generally-5000-999811/chapter-7-professional-engineers-6700-6799

                    Section 6728.1 - Members

                                  Each review committee shall consist of no fewer than three registered professional engineers appointed by the board. Each member of a committee shall have the same                                    qualifications and shall be subject to the same rules and regulations as if he were a member of the board.  . Bus. and Prof'l. Code § 6728.1

                        

Contract & Invoice&Obligations

1. Contract 

   1.1 Contract Example

 

 

   1.2 Lean 

     

Construction lean, also known as Lean Construction or Lean Project Delivery, is an approach that aims to optimize efficiency and minimize waste in the construction industry. It draws inspiration from the principles of lean manufacturing and applies them to construction processes, with the goal of improving project outcomes, reducing costs, and increasing customer satisfaction.

The core principles of construction lean include:

1.                  Value: Focus on delivering value to the customer. Identify what the customer truly wants and eliminate activities that do not add value.

2.                  Elimination of waste: Eliminate waste in all forms, including overproduction, excess inventory, waiting time, transportation, defects, and unnecessary motion. By reducing waste, projects become more efficient and cost-effective.

3.                  Continuous improvement: Encourage a culture of continuous improvement and learning. Seek feedback from all stakeholders, analyze performance metrics, and make incremental changes to improve processes and outcomes.

4.                  Collaboration and communication: Foster collaboration and effective communication among all project stakeholders, including the owner, designers, contractors, and subcontractors. This helps to streamline processes, reduce misunderstandings, and promote a shared understanding of project goals.

5.                  Pull planning: Use pull planning techniques to coordinate work activities. This involves involving all stakeholders in the planning process, breaking down tasks into smaller components, and scheduling work based on demand and available capacity.

6.                  Visual management: Utilize visual tools and displays to provide real-time information about project progress, key milestones, and potential bottlenecks. Visual management helps teams stay informed, identify issues early, and make data-driven decisions.

7.                  Standardization: Develop standard processes and best practices to improve efficiency, reduce errors, and promote consistency across projects. Standardization simplifies work, enhances productivity, and enables easier training and knowledge transfer.

Implementing construction lean requires a shift in mindset and a commitment to change. It involves adopting new practices, investing in training and development, and embracing a culture of collaboration and continuous improvement. By applying lean principles, construction projects can achieve better outcomes, deliver projects on time and within budget, and enhance overall customer satisfaction.

Top of Form

Regenerate response

   1.3: Early Termnation

       

An architecture contract is a legally binding agreement between an architect and a client that outlines the terms and conditions of their professional relationship. Early termination of an architecture contract refers to the situation where one party decides to end the contract before its agreed-upon completion date.

The specific provisions regarding early termination will be outlined in the contract itself. These provisions typically include clauses related to termination rights, termination notice periods, and any associated penalties or consequences.

When considering early termination, it is important to carefully review the contract to understand the rights and obligations of both parties. Here are some key points to consider:

1.  Termination rights: The contract should clearly state the circumstances under which either party can terminate the agreement. These reasons may include breach of contract, failure to perform obligations, or mutual agreement.

2.  Notice period: The contract may specify a notice period that must be given by the terminating party before the termination takes effect. This period allows the other party to prepare for the contract's end and potentially resolve any outstanding issues.

3.  Termination fees or penalties: The contract may include provisions for payment of termination fees or penalties by the party terminating the agreement. These fees or penalties are typically meant to compensate the non-terminating party for costs incurred or losses suffered due to early termination.

4.  Dispute resolution: In the event of a disagreement regarding early termination, the contract may include provisions for dispute resolution mechanisms such as mediation, arbitration, or litigation.

5.  Intellectual property and deliverables: The contract should address the ownership and transfer of intellectual property rights and specify any deliverables or unfinished work that must be returned or completed upon termination.

It is important to consult with legal professionals specializing in contract law or seek advice from a qualified architect to fully understand the implications and potential consequences of early termination. Each contract may have unique provisions, so it is crucial to carefully review the specific terms of the agreement in question.

  

       

2.  Invoice

 

3.Obligations